Pothole Repair Update – Nov. 9-15

​Alachua County is providing its weekly update on pothole repairs and roadway resurfacing throughout the county. Public Works crews continue to use reports submitted through the online Pothole Portal to identify areas needing repairs and prioritize work.

Weekly update

During the week of Nov. 9-15, Public Works crews:

  • Repaired 1,088 potholes, using 39.82 tons of material.
  • Strip-milled and resurfaced 7,040 linear feet of roadway, using 253.86 tons of material.


Cumulative totals

In total, since launching the portal, Public Works crews have:

  • Repaired 10,448 potholes, using 452.66 tons of materials.
  • Strip-milled and resurfaced 37,719 lineal feet of roadway, using 1,441.61 tons of material.
  • Worked with contractors to strip-mill and resurface another 31,773.88 lineal feet of roadway, using 2,579.47 tons of material.
  • Columbia County has repaired 584 potholes, using 8.31 tons of material.


Alachua County will continue to provide weekly reports to keep residents informed about progress. Updates will also be posted on the county’s website, social media channels and in the My Alachua County App. 

Residents are encouraged to use the Pothole Portal to:

  • Pinpoint the location of a pothole or other roadway issue on an interactive map.
  • Submit a report with or without creating an account.
  • Track pothole information through the county’s digital system.


Report a pothole or another roadway issue.

The Pothole Portal replaces rbmaintenance@alachuacounty.gov as the preferred method for reporting roadway issues. 

For more information, contact Alachua County Communications Director Mark Sexton at 352-283-2317 or msexton@alachuacounty.gov.

Read All About It: Alachua County News and Updates

Keep up-to-date with all news and developments in your community, delivered to your inbox.

Subscribe​